West Park Complex

Project
: West Park Complex
Covered By
: GRC/GFRC (fiber glass reinforced concrete)
Location
: Iraq ,Kurdistan Erbil
Total Coverage
: 2,300 m²
Status
: Completed

Project Overview


The Westpark Complex features one of Erbil’s most technically challenging façade designs, characterized by sweeping curves and pronounced vertical lines.


Nubin Factory successfully transformed this complex architectural vision into a fully realized GFRC cladding system.


Our engineering team produced precise shop drawings and carefully planned panel divisions, ensuring the building’s fluid geometry remained uninterrupted.


A defining strength of this project was our ability to manufacture exceptionally large GFRC panels while maintaining outstanding accuracy, durability, and surface quality.


These oversized elements played a key role in achieving the façade’s seamless, continuous appearance. Through advanced production techniques and rigorous quality control, Nubin delivered a façade that meets the highest standards of aesthetics, engineering, and performance.